5. Event Modelling

The Crowd Management Plan

In this section we outline the element for a safe, robust crowd management plan - first we define the scope of event modelling in the context of a project.


Project Analysis

It is important to note crowd and event modelling projects all follow a similar process. This process, outlined in Pedestrian Planning and Design (Fruin), has proven itself over the last two decades. The essence of model building is in understanding the clients needs and the limitations of any modelling technique. Caution is advised if you believe one tool, one software system, one methodology or one technique can be used to solve large complex crowd problems.

When all you have is a hammer - every problem looks like a nail.

You cannot hope to capture all the aspects of a complex dynamic environment where human factors are involved. Common sense tells you that any attempt to model the full scope of reality would have to capture all the elements that may have an influence on individuals. This attitude to comprehensive modelling is both flawed and intractable. 

A more practicable and sensible approach is to analysis the clients requirements and develop appropriate models for each aspect of the project. For example statistical analysis would be appropriate for some projects (spreadsheet modelling) and some projects may require a virtual reality model of 3D interactions (through time). Therefore the choice of tools and techniques is as important as understanding and defining the project.


Fruin 1

Define the Objectives

Clearly every project should begin with a set of objectives. Over the last decade we've developed tools and techniques that assist us in understanding clients pedestrian planning needs. Most of ths initial project is spent in understanding the key elements of the project. It is important to understand that there are a number of appropriate techniques and that you explore the different modelling approaches available.


Data Collection

During the project we typically collated a wide range of photographs, CAD plans and information from a the client, and other agencies (police, security, architect, etc). We would also run a site workshop with a multi-agency team, around a wide range of scenarios relating to that project. On every project we devote time to gathering the appropriate information - again the experience of what can be modelled and what techniques should be used on a specific project is important. By spending time on data collection and collation you can assess the appropriate tools/techniques most suitable for that specific project. No point in using a jack hammer to crack a walnut. Always, where possible, walk the site.


Analysis

Analysis of the data is typically performed using a wide range of resources. This may be head counting on videos, flow rate analysis, density analysis, distribution analysis and many other aspects of both crowd management and crowd control. Evaluating crowd management plans, event plans and site plans takes time - but the objective is to assess the clients needs with respect to crowd safety.


Contingency Plans/Simulations

It is important to note that running one simulation is not enough to study many types of high density pedestrian environments. Often we need to test the extremes (pedestrian not moving and all pedestrians moving) to discover the "solution space" of a problem. This is a reality check and provides us with a benchmark for further modelling and simulation runs. By considering the extremes we can represent the conditions at which the risks of crowd injury can be assessed. Clearly these represent two different types of management strategy (low density and high density) and it is important to contingency plan for either extreme. Simulations assist us in both understanding a specific scenario (as it develops) and planning the appropriate crowd management strategyy, process and procedures. By testing the extreme conditions (no-one moving, crowds building up, rates of flow, everyone moving, trips/falls etc.) we are reasonably certain to have contingency planned for the worst case scenarios and plan accordingly. Always test the plan and strategy for 200% - 500% (or more) people arriving over a shorter period of time than expected to test the robustness and contingency plan for the management process.


Presentations/Approval

It is important to note that any issues relating to the pedestrian planning and design may involve a range of agencies (Police, civil defence, architects, medical, waste management, security forces, etc) and that the presentation of plans/suggestions be clearly understood by all parties. Given the language differences in the many countries we work; we adopt a graphic presentation technique using Keynote to highlight, with many illustrations, the problems as we perceive them. Given our wide range of international experience in crowd modelling this process makes the style of presenting complex situation successful for workshop formats and we've colected many hundreds of case studies to illustrate key crowd problems.


Design Phase

It is important to note that during the design phase many elements of the design can change. We are specifically concerned about the lack of information that is typically missing during the early stages of build - mostly involving the management and operations procedures. Therefore we are often presenting to the operations and management team during the build phase of projects. This allows us to act as a communications conduit for both the design and operations groups working on complex places of public assembly.


Simulations/Approval

We test a wide range of issues relating to the design. Often these are subject to approval by the operators and we run workshop to facilitate understanding of the various models and simulation results. It is not enough to run a model and assume that all parties will both understand the model and be able to adopt a suitable operational procedure. We strongly advise that the process of modelling/simulation currently. Writing an operational/procedural manual must be a continual process during the construction phases of large complex spaces.


Operations Manual

The process of creating and running a simulation allows a skilled operator to assess a wide range of contingency conditions. It is advised that modelling and operational procedures run as a joint project. The development of an integrated management response team improves crowd safety and is a common feature of large scale events (such as the Olympics etc) worldwide. These involve multi-agency team (which includes police, medical, civil defence, waste management, security forces, etc). We have extensive experience at running and facilitating these types of workshops.


Continuous Revision Process

It is important to maintain a continuous process of build, modelling, simulation and writing/testing operational procedures to ensure the operational efficiency and crowd safety during the build phase of large complex environments. We have outlined the basis of our data analysis and initial conclusions. One additional element is to evaluate the accident from a timeline analysis of previous accidents around the world. We have extensive experience of accident analysis from around the world. This knowledge has helped us in many different projects include the evacuation analysis of Canary Wharf, the Hajj, MFCF and MUFC Victory Parades, Leicester Caribbean Carnival, the 2011 Royal Wedding and many other projects.